Massachusetts (MA) · $0.291/kWh · CCS · 102 kWh
Cost to charge a Chevrolet Blazer EV RS RWD in Massachusetts
Charging a 2025 Chevrolet Blazer EV RS RWD at home in Massachusetts costs $33.73 for a full 0–100% charge or $20.24 for a 20%–80% daily top-up (12% AC charging loss factored).
EIA state average: $0.291/kWh
Estimated cost
$20.24
69.5 kWh billed
Charging time
6h 3m
+200 miles added
Cost per 100 miles
$10.10
Annual savings vs. gas
+$151/yr
12,000 mi/yr vs. 28 MPG
Full charge (0–100%)
$33.73
115.9 kWh billed · 10h 5m (L2)
Daily charge (20–80%)
$20.24
+200 mi range · 6h 3m (L2)
Home vs. public DC (20–80%)
$20.24 vs. $32.44
DC fast takes 29m (~$0.53/kWh)
12,000-mile annual savings
+$151/yr
EV $1,212 vs. gas $1,363
Home charger hardware requirements for Chevrolet Blazer EV RS RWD
Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.
Required connector
CCS1 / SAE J1772
Recommended breaker
40A–60A (240V)
Max AC acceptance rate
11.5 kW
Frequently asked questions: Chevrolet Blazer EV RS RWD in Massachusetts
How much does it cost to fully charge a Chevrolet Blazer EV RS RWD in Massachusetts?
At Massachusetts's average residential electricity rate of $0.291/kWh, a full 0% to 100% home charge for the Chevrolet Blazer EV RS RWD (102 kWh usable battery) costs $33.73. This includes a realistic 12% AC charging loss, meaning your meter bills 115.9 kWh.
How much does a 20% to 80% daily charge cost in Massachusetts?
Topping up from 20% to 80% at home on a Level 2 charger costs $20.24 and adds 200 miles of EPA range in 6h 3m. At a public DC fast charger (~$0.53/kWh), the same 20%–80% session costs $32.44 and takes about 29m.
How long does it take to charge a Chevrolet Blazer EV RS RWD at home vs. DC fast charging?
On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 6h 3m, while a standard 120V Level 1 outlet takes 49h 41m. On a high-speed DC fast charger, 10%–80% takes roughly 34m.
How much money does a Chevrolet Blazer EV RS RWD save vs. a gas car in Massachusetts?
Driving 12,000 miles per year in Massachusetts costs $1,212/year in home electricity ($10.10 per 100 miles), compared to $1,363/year for a 28 MPG gas car at $3.18/gal — saving you $151 annually.