EVChargeCalc

Louisiana (LA) · $0.118/kWh · CCS · 205 kWh

Cost to charge a Chevrolet Silverado EV RST in Louisiana

Charging a 2025 Chevrolet Silverado EV RST at home in Louisiana costs $27.49 for a full 0–100% charge or $16.49 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.118/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$16.49

139.8 kWh billed

Charging time

12h 9m

+264 miles added

Cost per 100 miles

$6.25

Annual savings vs. gas

+$442/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $3.68 / 100 mi
Chevrolet Silverado EV RST$6.25
28 MPG gas car ($2.78/gal)$9.93
Real-world physics: Includes a 12% AC charging loss factor (123.0 kWh ÷ 0.88 = 139.8 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$27.49

233.0 kWh billed · 20h 15m (L2)

Daily charge (20–80%)

$16.49

+264 mi range · 12h 9m (L2)

Home vs. public DC (20–80%)

$16.49 vs. $47.97

DC fast takes 36m (~$0.39/kWh)

12,000-mile annual savings

+$442/yr

EV $750 vs. gas $1,191

Hardware specification

Home charger hardware requirements for Chevrolet Silverado EV RST

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

60A–100A (240V)

Max AC acceptance rate

19.2 kW

Frequently asked questions: Chevrolet Silverado EV RST in Louisiana

How much does it cost to fully charge a Chevrolet Silverado EV RST in Louisiana?

At Louisiana's average residential electricity rate of $0.118/kWh, a full 0% to 100% home charge for the Chevrolet Silverado EV RST (205 kWh usable battery) costs $27.49. This includes a realistic 12% AC charging loss, meaning your meter bills 233.0 kWh.

How much does a 20% to 80% daily charge cost in Louisiana?

Topping up from 20% to 80% at home on a Level 2 charger costs $16.49 and adds 264 miles of EPA range in 12h 9m. At a public DC fast charger (~$0.39/kWh), the same 20%–80% session costs $47.97 and takes about 36m.

How long does it take to charge a Chevrolet Silverado EV RST at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 19.2 kW onboard charger), a 20%–80% charge takes 12h 9m, while a standard 120V Level 1 outlet takes 99h 50m. On a high-speed DC fast charger, 10%–80% takes roughly 42m.

How much money does a Chevrolet Silverado EV RST save vs. a gas car in Louisiana?

Driving 12,000 miles per year in Louisiana costs $750/year in home electricity ($6.25 per 100 miles), compared to $1,191/year for a 28 MPG gas car at $2.78/gal — saving you $442 annually.

Compare Chevrolet Silverado EV RST in other states