Connecticut (CT) · $0.284/kWh · CCS · 91 kWh
Cost to charge a Ford Mustang Mach-E GT in Connecticut
Charging a 2025 Ford Mustang Mach-E GT at home in Connecticut costs $29.37 for a full 0–100% charge or $17.62 for a 20%–80% daily top-up (12% AC charging loss factored).
EIA state average: $0.284/kWh
Estimated cost
$17.62
62.0 kWh billed
Charging time
5h 55m
+168 miles added
Cost per 100 miles
$10.49
Annual savings vs. gas
+$130/yr
12,000 mi/yr vs. 28 MPG
Full charge (0–100%)
$29.37
103.4 kWh billed · 9h 51m (L2)
Daily charge (20–80%)
$17.62
+168 mi range · 5h 55m (L2)
Home vs. public DC (20–80%)
$17.62 vs. $28.39
DC fast takes 31m (~$0.52/kWh)
12,000-mile annual savings
+$130/yr
EV $1,259 vs. gas $1,389
Home charger hardware requirements for Ford Mustang Mach-E GT
Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.
Required connector
CCS1 / SAE J1772
Recommended breaker
40A–60A (240V)
Max AC acceptance rate
10.5 kW
Frequently asked questions: Ford Mustang Mach-E GT in Connecticut
How much does it cost to fully charge a Ford Mustang Mach-E GT in Connecticut?
At Connecticut's average residential electricity rate of $0.284/kWh, a full 0% to 100% home charge for the Ford Mustang Mach-E GT (91 kWh usable battery) costs $29.37. This includes a realistic 12% AC charging loss, meaning your meter bills 103.4 kWh.
How much does a 20% to 80% daily charge cost in Connecticut?
Topping up from 20% to 80% at home on a Level 2 charger costs $17.62 and adds 168 miles of EPA range in 5h 55m. At a public DC fast charger (~$0.52/kWh), the same 20%–80% session costs $28.39 and takes about 31m.
How long does it take to charge a Ford Mustang Mach-E GT at home vs. DC fast charging?
On a 48A Level 2 home charger (limited by the vehicle's 10.5 kW onboard charger), a 20%–80% charge takes 5h 55m, while a standard 120V Level 1 outlet takes 44h 19m. On a high-speed DC fast charger, 10%–80% takes roughly 36m.
How much money does a Ford Mustang Mach-E GT save vs. a gas car in Connecticut?
Driving 12,000 miles per year in Connecticut costs $1,259/year in home electricity ($10.49 per 100 miles), compared to $1,389/year for a 28 MPG gas car at $3.24/gal — saving you $130 annually.