EVChargeCalc

Wyoming (WY) · $0.123/kWh · CCS · 91 kWh

Cost to charge a Ford Mustang Mach-E GT in Wyoming

Charging a 2025 Ford Mustang Mach-E GT at home in Wyoming costs $12.72 for a full 0–100% charge or $7.63 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.123/kWh

Charger type
20%
80%
Charging summaryCCS · 10.5 kW avg

Estimated cost

$7.63

62.0 kWh billed

Charging time

5h 55m

+168 miles added

Cost per 100 miles

$4.54

Annual savings vs. gas

+$801/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $6.67 / 100 mi
Ford Mustang Mach-E GT$4.54
28 MPG gas car ($3.14/gal)$11.21
Real-world physics: Includes a 12% AC charging loss factor (54.6 kWh ÷ 0.88 = 62.0 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$12.72

103.4 kWh billed · 9h 51m (L2)

Daily charge (20–80%)

$7.63

+168 mi range · 5h 55m (L2)

Home vs. public DC (20–80%)

$7.63 vs. $21.84

DC fast takes 31m (~$0.40/kWh)

12,000-mile annual savings

+$801/yr

EV $545 vs. gas $1,346

Hardware specification

Home charger hardware requirements for Ford Mustang Mach-E GT

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

10.5 kW

Frequently asked questions: Ford Mustang Mach-E GT in Wyoming

How much does it cost to fully charge a Ford Mustang Mach-E GT in Wyoming?

At Wyoming's average residential electricity rate of $0.123/kWh, a full 0% to 100% home charge for the Ford Mustang Mach-E GT (91 kWh usable battery) costs $12.72. This includes a realistic 12% AC charging loss, meaning your meter bills 103.4 kWh.

How much does a 20% to 80% daily charge cost in Wyoming?

Topping up from 20% to 80% at home on a Level 2 charger costs $7.63 and adds 168 miles of EPA range in 5h 55m. At a public DC fast charger (~$0.40/kWh), the same 20%–80% session costs $21.84 and takes about 31m.

How long does it take to charge a Ford Mustang Mach-E GT at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 10.5 kW onboard charger), a 20%–80% charge takes 5h 55m, while a standard 120V Level 1 outlet takes 44h 19m. On a high-speed DC fast charger, 10%–80% takes roughly 36m.

How much money does a Ford Mustang Mach-E GT save vs. a gas car in Wyoming?

Driving 12,000 miles per year in Wyoming costs $545/year in home electricity ($4.54 per 100 miles), compared to $1,346/year for a 28 MPG gas car at $3.14/gal — saving you $801 annually.

Compare Ford Mustang Mach-E GT in other states