EVChargeCalc

New Jersey (NJ) · $0.186/kWh · CCS · 72 kWh

Cost to charge a Ford Mustang Mach-E Select RWD in New Jersey

Charging a 2025 Ford Mustang Mach-E Select RWD at home in New Jersey costs $15.22 for a full 0–100% charge or $9.13 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.186/kWh

Charger type
20%
80%
Charging summaryCCS · 10.5 kW avg

Estimated cost

$9.13

49.1 kWh billed

Charging time

4h 41m

+150 miles added

Cost per 100 miles

$6.09

Annual savings vs. gas

+$602/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $5.02 / 100 mi
Ford Mustang Mach-E Select RWD$6.09
28 MPG gas car ($3.11/gal)$11.11
Real-world physics: Includes a 12% AC charging loss factor (43.2 kWh ÷ 0.88 = 49.1 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$15.22

81.8 kWh billed · 7h 48m (L2)

Daily charge (20–80%)

$9.13

+150 mi range · 4h 41m (L2)

Home vs. public DC (20–80%)

$9.13 vs. $20.30

DC fast takes 27m (~$0.47/kWh)

12,000-mile annual savings

+$602/yr

EV $730 vs. gas $1,333

Hardware specification

Home charger hardware requirements for Ford Mustang Mach-E Select RWD

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

10.5 kW

Frequently asked questions: Ford Mustang Mach-E Select RWD in New Jersey

How much does it cost to fully charge a Ford Mustang Mach-E Select RWD in New Jersey?

At New Jersey's average residential electricity rate of $0.186/kWh, a full 0% to 100% home charge for the Ford Mustang Mach-E Select RWD (72 kWh usable battery) costs $15.22. This includes a realistic 12% AC charging loss, meaning your meter bills 81.8 kWh.

How much does a 20% to 80% daily charge cost in New Jersey?

Topping up from 20% to 80% at home on a Level 2 charger costs $9.13 and adds 150 miles of EPA range in 4h 41m. At a public DC fast charger (~$0.47/kWh), the same 20%–80% session costs $20.30 and takes about 27m.

How long does it take to charge a Ford Mustang Mach-E Select RWD at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 10.5 kW onboard charger), a 20%–80% charge takes 4h 41m, while a standard 120V Level 1 outlet takes 35h 4m. On a high-speed DC fast charger, 10%–80% takes roughly 32m.

How much money does a Ford Mustang Mach-E Select RWD save vs. a gas car in New Jersey?

Driving 12,000 miles per year in New Jersey costs $730/year in home electricity ($6.09 per 100 miles), compared to $1,333/year for a 28 MPG gas car at $3.11/gal — saving you $602 annually.

Compare Ford Mustang Mach-E Select RWD in other states