EVChargeCalc

2025 Sedan · CCS connector · 112 kWh usable battery

Lucid Air Grand Touring Charging Cost & Time Calculator

512 mi EPA range · 19.2 kW max AC onboard charger · 300 kW peak DC fast charge (24 min 10%–80%).

$

EIA state average: $0.312/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$23.83

76.4 kWh billed

Charging time

6h 38m

+307 miles added

Cost per 100 miles

$7.76

Annual savings vs. gas

+$1,075/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $8.96 / 100 mi
Lucid Air Grand Touring$7.76
28 MPG gas car ($4.68/gal)$16.71
Real-world physics: Includes a 12% AC charging loss factor (67.2 kWh ÷ 0.88 = 76.4 kWh from wall) so estimates reflect your utility bill.

Lucid Air Grand Touring charging time & cost by charger type

Calculated using US average rates ($0.168/kWh home AC with 12% charging loss; $0.450/kWh public DC fast).

Charger typePower20%–80% time20%–80% cost0%–100% time0%–100% cost
Level 1 (1.4 kW)1.4 kW54h 33m$12.8390h 55m$21.38
Level 2 (7.2 kW)7.2 kW10h 36m$12.8317h 41m$21.38
Level 2 (9.6 kW)9.6 kW7h 57m$12.8313h 15m$21.38
Level 2 (11.5 kW)11.5 kW6h 38m$12.8311h 4m$21.38
DC Fast Charger196.0 kW21m$30.2445m$50.40
Hardware specification

Home charger hardware requirements for Lucid Air Grand Touring

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

60A–100A (240V)

Max AC acceptance rate

19.2 kW

Lucid Air Grand Touring charging cost by state

Select your state for local utility costs, DC fast-charging comparisons, and annual gas savings on EV Charge Calc.