EVChargeCalc

Alaska (AK) · $0.246/kWh · CCS · 118 kWh

Cost to charge a Mercedes-Benz EQS 450+ in Alaska

Charging a 2025 Mercedes-Benz EQS 450+ at home in Alaska costs $32.99 for a full 0–100% charge or $19.79 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.246/kWh

Charger type
20%
80%
Charging summaryCCS · 9.6 kW avg

Estimated cost

$19.79

80.5 kWh billed

Charging time

8h 23m

+234 miles added

Cost per 100 miles

$8.46

Annual savings vs. gas

+$562/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.68 / 100 mi
Mercedes-Benz EQS 450+$8.46
28 MPG gas car ($3.68/gal)$13.14
Real-world physics: Includes a 12% AC charging loss factor (70.8 kWh ÷ 0.88 = 80.5 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$32.99

134.1 kWh billed · 13h 58m (L2)

Daily charge (20–80%)

$19.79

+234 mi range · 8h 23m (L2)

Home vs. public DC (20–80%)

$19.79 vs. $34.69

DC fast takes 27m (~$0.49/kWh)

12,000-mile annual savings

+$562/yr

EV $1,015 vs. gas $1,577

Hardware specification

Home charger hardware requirements for Mercedes-Benz EQS 450+

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

9.6 kW

Frequently asked questions: Mercedes-Benz EQS 450+ in Alaska

How much does it cost to fully charge a Mercedes-Benz EQS 450+ in Alaska?

At Alaska's average residential electricity rate of $0.246/kWh, a full 0% to 100% home charge for the Mercedes-Benz EQS 450+ (118 kWh usable battery) costs $32.99. This includes a realistic 12% AC charging loss, meaning your meter bills 134.1 kWh.

How much does a 20% to 80% daily charge cost in Alaska?

Topping up from 20% to 80% at home on a Level 2 charger costs $19.79 and adds 234 miles of EPA range in 8h 23m. At a public DC fast charger (~$0.49/kWh), the same 20%–80% session costs $34.69 and takes about 27m.

How long does it take to charge a Mercedes-Benz EQS 450+ at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 9.6 kW onboard charger), a 20%–80% charge takes 8h 23m, while a standard 120V Level 1 outlet takes 57h 28m. On a high-speed DC fast charger, 10%–80% takes roughly 31m.

How much money does a Mercedes-Benz EQS 450+ save vs. a gas car in Alaska?

Driving 12,000 miles per year in Alaska costs $1,015/year in home electricity ($8.46 per 100 miles), compared to $1,577/year for a 28 MPG gas car at $3.68/gal — saving you $562 annually.

Compare Mercedes-Benz EQS 450+ in other states