EVChargeCalc

Maryland (MD) · $0.175/kWh · CCS · 87 kWh

Cost to charge a Nissan Ariya Engage+ e-4ORCE in Maryland

Charging a 2025 Nissan Ariya Engage+ e-4ORCE at home in Maryland costs $17.30 for a full 0–100% charge or $10.38 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.175/kWh

Charger type
20%
80%
Charging summaryCCS · 7.2 kW avg

Estimated cost

$10.38

59.3 kWh billed

Charging time

8h 14m

+163 miles added

Cost per 100 miles

$6.36

Annual savings vs. gas

+$591/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.93 / 100 mi
Nissan Ariya Engage+ e-4ORCE$6.36
28 MPG gas car ($3.16/gal)$11.29
Real-world physics: Includes a 12% AC charging loss factor (52.2 kWh ÷ 0.88 = 59.3 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$17.30

98.9 kWh billed · 13h 44m (L2)

Daily charge (20–80%)

$10.38

+163 mi range · 8h 14m (L2)

Home vs. public DC (20–80%)

$10.38 vs. $24.01

DC fast takes 30m (~$0.46/kWh)

12,000-mile annual savings

+$591/yr

EV $763 vs. gas $1,354

Hardware specification

Home charger hardware requirements for Nissan Ariya Engage+ e-4ORCE

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

7.2 kW

Frequently asked questions: Nissan Ariya Engage+ e-4ORCE in Maryland

How much does it cost to fully charge a Nissan Ariya Engage+ e-4ORCE in Maryland?

At Maryland's average residential electricity rate of $0.175/kWh, a full 0% to 100% home charge for the Nissan Ariya Engage+ e-4ORCE (87 kWh usable battery) costs $17.30. This includes a realistic 12% AC charging loss, meaning your meter bills 98.9 kWh.

How much does a 20% to 80% daily charge cost in Maryland?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.38 and adds 163 miles of EPA range in 8h 14m. At a public DC fast charger (~$0.46/kWh), the same 20%–80% session costs $24.01 and takes about 30m.

How long does it take to charge a Nissan Ariya Engage+ e-4ORCE at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 7.2 kW onboard charger), a 20%–80% charge takes 8h 14m, while a standard 120V Level 1 outlet takes 42h 22m. On a high-speed DC fast charger, 10%–80% takes roughly 35m.

How much money does a Nissan Ariya Engage+ e-4ORCE save vs. a gas car in Maryland?

Driving 12,000 miles per year in Maryland costs $763/year in home electricity ($6.36 per 100 miles), compared to $1,354/year for a 28 MPG gas car at $3.16/gal — saving you $591 annually.

Compare Nissan Ariya Engage+ e-4ORCE in other states