EVChargeCalc

California (CA) · $0.312/kWh · CCS · 60 kWh

Cost to charge a Nissan LEAF SV Plus in California

Charging a 2025 Nissan LEAF SV Plus at home in California costs $21.27 for a full 0–100% charge or $12.76 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.312/kWh

Charger type
20%
80%
Charging summaryCCS · 6.6 kW avg

Estimated cost

$12.76

40.9 kWh billed

Charging time

6h 12m

+127 miles added

Cost per 100 miles

$10.03

Annual savings vs. gas

+$802/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $6.68 / 100 mi
Nissan LEAF SV Plus$10.03
28 MPG gas car ($4.68/gal)$16.71
Real-world physics: Includes a 12% AC charging loss factor (36.0 kWh ÷ 0.88 = 40.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$21.27

68.2 kWh billed · 10h 20m (L2)

Daily charge (20–80%)

$12.76

+127 mi range · 6h 12m (L2)

Home vs. public DC (20–80%)

$12.76 vs. $20.16

DC fast takes 39m (~$0.56/kWh)

12,000-mile annual savings

+$802/yr

EV $1,204 vs. gas $2,006

Hardware specification

Home charger hardware requirements for Nissan LEAF SV Plus

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

6.6 kW

Frequently asked questions: Nissan LEAF SV Plus in California

How much does it cost to fully charge a Nissan LEAF SV Plus in California?

At California's average residential electricity rate of $0.312/kWh, a full 0% to 100% home charge for the Nissan LEAF SV Plus (60 kWh usable battery) costs $21.27. This includes a realistic 12% AC charging loss, meaning your meter bills 68.2 kWh.

How much does a 20% to 80% daily charge cost in California?

Topping up from 20% to 80% at home on a Level 2 charger costs $12.76 and adds 127 miles of EPA range in 6h 12m. At a public DC fast charger (~$0.56/kWh), the same 20%–80% session costs $20.16 and takes about 39m.

How long does it take to charge a Nissan LEAF SV Plus at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 6.6 kW onboard charger), a 20%–80% charge takes 6h 12m, while a standard 120V Level 1 outlet takes 29h 13m. On a high-speed DC fast charger, 10%–80% takes roughly 45m.

How much money does a Nissan LEAF SV Plus save vs. a gas car in California?

Driving 12,000 miles per year in California costs $1,204/year in home electricity ($10.03 per 100 miles), compared to $2,006/year for a 28 MPG gas car at $4.68/gal — saving you $802 annually.

Compare Nissan LEAF SV Plus in other states