EVChargeCalc

Nebraska (NE) · $0.119/kWh · CCS · 79 kWh

Cost to charge a Polestar 2 Long Range Dual Motor in Nebraska

Charging a 2025 Polestar 2 Long Range Dual Motor at home in Nebraska costs $10.68 for a full 0–100% charge or $6.41 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.119/kWh

Charger type
20%
80%
Charging summaryCCS · 11.0 kW avg

Estimated cost

$6.41

53.9 kWh billed

Charging time

4h 54m

+166 miles added

Cost per 100 miles

$3.87

Annual savings vs. gas

+$804/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $6.70 / 100 mi
Polestar 2 Long Range Dual Motor$3.87
28 MPG gas car ($2.96/gal)$10.57
Real-world physics: Includes a 12% AC charging loss factor (47.4 kWh ÷ 0.88 = 53.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$10.68

89.8 kWh billed · 8h 10m (L2)

Daily charge (20–80%)

$6.41

+166 mi range · 4h 54m (L2)

Home vs. public DC (20–80%)

$6.41 vs. $18.49

DC fast takes 24m (~$0.39/kWh)

12,000-mile annual savings

+$804/yr

EV $464 vs. gas $1,269

Hardware specification

Home charger hardware requirements for Polestar 2 Long Range Dual Motor

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.0 kW

Frequently asked questions: Polestar 2 Long Range Dual Motor in Nebraska

How much does it cost to fully charge a Polestar 2 Long Range Dual Motor in Nebraska?

At Nebraska's average residential electricity rate of $0.119/kWh, a full 0% to 100% home charge for the Polestar 2 Long Range Dual Motor (79 kWh usable battery) costs $10.68. This includes a realistic 12% AC charging loss, meaning your meter bills 89.8 kWh.

How much does a 20% to 80% daily charge cost in Nebraska?

Topping up from 20% to 80% at home on a Level 2 charger costs $6.41 and adds 166 miles of EPA range in 4h 54m. At a public DC fast charger (~$0.39/kWh), the same 20%–80% session costs $18.49 and takes about 24m.

How long does it take to charge a Polestar 2 Long Range Dual Motor at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11 kW onboard charger), a 20%–80% charge takes 4h 54m, while a standard 120V Level 1 outlet takes 38h 28m. On a high-speed DC fast charger, 10%–80% takes roughly 28m.

How much money does a Polestar 2 Long Range Dual Motor save vs. a gas car in Nebraska?

Driving 12,000 miles per year in Nebraska costs $464/year in home electricity ($3.87 per 100 miles), compared to $1,269/year for a 28 MPG gas car at $2.96/gal — saving you $804 annually.

Compare Polestar 2 Long Range Dual Motor in other states