EVChargeCalc

District of Columbia (DC) · $0.174/kWh · CCS · 109.4 kWh

Cost to charge a Rivian R1S Dual Large in District of Columbia

Charging a 2025 Rivian R1S Dual Large at home in District of Columbia costs $21.63 for a full 0–100% charge or $12.98 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.174/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$12.98

74.6 kWh billed

Charging time

6h 29m

+197 miles added

Cost per 100 miles

$6.57

Annual savings vs. gas

+$647/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $5.39 / 100 mi
Rivian R1S Dual Large$6.57
28 MPG gas car ($3.35/gal)$11.96
Real-world physics: Includes a 12% AC charging loss factor (65.6 kWh ÷ 0.88 = 74.6 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$21.63

124.3 kWh billed · 10h 49m (L2)

Daily charge (20–80%)

$12.98

+197 mi range · 6h 29m (L2)

Home vs. public DC (20–80%)

$12.98 vs. $30.19

DC fast takes 30m (~$0.46/kWh)

12,000-mile annual savings

+$647/yr

EV $789 vs. gas $1,436

Hardware specification

Home charger hardware requirements for Rivian R1S Dual Large

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Rivian R1S Dual Large in District of Columbia

How much does it cost to fully charge a Rivian R1S Dual Large in District of Columbia?

At District of Columbia's average residential electricity rate of $0.174/kWh, a full 0% to 100% home charge for the Rivian R1S Dual Large (109.4 kWh usable battery) costs $21.63. This includes a realistic 12% AC charging loss, meaning your meter bills 124.3 kWh.

How much does a 20% to 80% daily charge cost in District of Columbia?

Topping up from 20% to 80% at home on a Level 2 charger costs $12.98 and adds 197 miles of EPA range in 6h 29m. At a public DC fast charger (~$0.46/kWh), the same 20%–80% session costs $30.19 and takes about 30m.

How long does it take to charge a Rivian R1S Dual Large at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 6h 29m, while a standard 120V Level 1 outlet takes 53h 17m. On a high-speed DC fast charger, 10%–80% takes roughly 35m.

How much money does a Rivian R1S Dual Large save vs. a gas car in District of Columbia?

Driving 12,000 miles per year in District of Columbia costs $789/year in home electricity ($6.57 per 100 miles), compared to $1,436/year for a 28 MPG gas car at $3.35/gal — saving you $647 annually.

Compare Rivian R1S Dual Large in other states