EVChargeCalc

Oregon (OR) · $0.142/kWh · CCS · 109.4 kWh

Cost to charge a Rivian R1S Dual Large in Oregon

Charging a 2025 Rivian R1S Dual Large at home in Oregon costs $17.65 for a full 0–100% charge or $10.59 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.142/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$10.59

74.6 kWh billed

Charging time

6h 29m

+197 miles added

Cost per 100 miles

$5.37

Annual savings vs. gas

+$1,036/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $8.63 / 100 mi
Rivian R1S Dual Large$5.37
28 MPG gas car ($3.92/gal)$14.00
Real-world physics: Includes a 12% AC charging loss factor (65.6 kWh ÷ 0.88 = 74.6 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$17.65

124.3 kWh billed · 10h 49m (L2)

Daily charge (20–80%)

$10.59

+197 mi range · 6h 29m (L2)

Home vs. public DC (20–80%)

$10.59 vs. $28.88

DC fast takes 30m (~$0.44/kWh)

12,000-mile annual savings

+$1,036/yr

EV $644 vs. gas $1,680

Hardware specification

Home charger hardware requirements for Rivian R1S Dual Large

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Rivian R1S Dual Large in Oregon

How much does it cost to fully charge a Rivian R1S Dual Large in Oregon?

At Oregon's average residential electricity rate of $0.142/kWh, a full 0% to 100% home charge for the Rivian R1S Dual Large (109.4 kWh usable battery) costs $17.65. This includes a realistic 12% AC charging loss, meaning your meter bills 124.3 kWh.

How much does a 20% to 80% daily charge cost in Oregon?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.59 and adds 197 miles of EPA range in 6h 29m. At a public DC fast charger (~$0.44/kWh), the same 20%–80% session costs $28.88 and takes about 30m.

How long does it take to charge a Rivian R1S Dual Large at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 6h 29m, while a standard 120V Level 1 outlet takes 53h 17m. On a high-speed DC fast charger, 10%–80% takes roughly 35m.

How much money does a Rivian R1S Dual Large save vs. a gas car in Oregon?

Driving 12,000 miles per year in Oregon costs $644/year in home electricity ($5.37 per 100 miles), compared to $1,680/year for a 28 MPG gas car at $3.92/gal — saving you $1,036 annually.

Compare Rivian R1S Dual Large in other states