EVChargeCalc

Alaska (AK) · $0.246/kWh · CCS · 141.5 kWh

Cost to charge a Rivian R1S Dual Max in Alaska

Charging a 2025 Rivian R1S Dual Max at home in Alaska costs $39.56 for a full 0–100% charge or $23.73 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.246/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$23.73

96.5 kWh billed

Charging time

8h 23m

+246 miles added

Cost per 100 miles

$9.65

Annual savings vs. gas

+$419/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $3.50 / 100 mi
Rivian R1S Dual Max$9.65
28 MPG gas car ($3.68/gal)$13.14
Real-world physics: Includes a 12% AC charging loss factor (84.9 kWh ÷ 0.88 = 96.5 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$39.56

160.8 kWh billed · 13h 59m (L2)

Daily charge (20–80%)

$23.73

+246 mi range · 8h 23m (L2)

Home vs. public DC (20–80%)

$23.73 vs. $41.60

DC fast takes 35m (~$0.49/kWh)

12,000-mile annual savings

+$419/yr

EV $1,158 vs. gas $1,577

Hardware specification

Home charger hardware requirements for Rivian R1S Dual Max

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Rivian R1S Dual Max in Alaska

How much does it cost to fully charge a Rivian R1S Dual Max in Alaska?

At Alaska's average residential electricity rate of $0.246/kWh, a full 0% to 100% home charge for the Rivian R1S Dual Max (141.5 kWh usable battery) costs $39.56. This includes a realistic 12% AC charging loss, meaning your meter bills 160.8 kWh.

How much does a 20% to 80% daily charge cost in Alaska?

Topping up from 20% to 80% at home on a Level 2 charger costs $23.73 and adds 246 miles of EPA range in 8h 23m. At a public DC fast charger (~$0.49/kWh), the same 20%–80% session costs $41.60 and takes about 35m.

How long does it take to charge a Rivian R1S Dual Max at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 8h 23m, while a standard 120V Level 1 outlet takes 68h 55m. On a high-speed DC fast charger, 10%–80% takes roughly 41m.

How much money does a Rivian R1S Dual Max save vs. a gas car in Alaska?

Driving 12,000 miles per year in Alaska costs $1,158/year in home electricity ($9.65 per 100 miles), compared to $1,577/year for a 28 MPG gas car at $3.68/gal — saving you $419 annually.

Compare Rivian R1S Dual Max in other states