EVChargeCalc

Ohio (OH) · $0.156/kWh · CCS · 141.5 kWh

Cost to charge a Rivian R1T Dual Max in Ohio

Charging a 2025 Rivian R1T Dual Max at home in Ohio costs $25.08 for a full 0–100% charge or $15.05 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.156/kWh

Charger type
20%
80%
Charging summaryCCS · 11.5 kW avg

Estimated cost

$15.05

96.5 kWh billed

Charging time

8h 23m

+252 miles added

Cost per 100 miles

$5.97

Annual savings vs. gas

+$586/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.88 / 100 mi
Rivian R1T Dual Max$5.97
28 MPG gas car ($3.04/gal)$10.86
Real-world physics: Includes a 12% AC charging loss factor (84.9 kWh ÷ 0.88 = 96.5 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$25.08

160.8 kWh billed · 13h 59m (L2)

Daily charge (20–80%)

$15.05

+252 mi range · 8h 23m (L2)

Home vs. public DC (20–80%)

$15.05 vs. $37.36

DC fast takes 35m (~$0.44/kWh)

12,000-mile annual savings

+$586/yr

EV $717 vs. gas $1,303

Hardware specification

Home charger hardware requirements for Rivian R1T Dual Max

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Rivian R1T Dual Max in Ohio

How much does it cost to fully charge a Rivian R1T Dual Max in Ohio?

At Ohio's average residential electricity rate of $0.156/kWh, a full 0% to 100% home charge for the Rivian R1T Dual Max (141.5 kWh usable battery) costs $25.08. This includes a realistic 12% AC charging loss, meaning your meter bills 160.8 kWh.

How much does a 20% to 80% daily charge cost in Ohio?

Topping up from 20% to 80% at home on a Level 2 charger costs $15.05 and adds 252 miles of EPA range in 8h 23m. At a public DC fast charger (~$0.44/kWh), the same 20%–80% session costs $37.36 and takes about 35m.

How long does it take to charge a Rivian R1T Dual Max at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 8h 23m, while a standard 120V Level 1 outlet takes 68h 55m. On a high-speed DC fast charger, 10%–80% takes roughly 41m.

How much money does a Rivian R1T Dual Max save vs. a gas car in Ohio?

Driving 12,000 miles per year in Ohio costs $717/year in home electricity ($5.97 per 100 miles), compared to $1,303/year for a 28 MPG gas car at $3.04/gal — saving you $586 annually.

Compare Rivian R1T Dual Max in other states