EVChargeCalc

Oklahoma (OK) · $0.122/kWh · NACS · 123 kWh

Cost to charge a Tesla Cybertruck AWD in Oklahoma

Charging a 2025 Tesla Cybertruck AWD at home in Oklahoma costs $17.05 for a full 0–100% charge or $10.23 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.122/kWh

Charger type
20%
80%
Charging summaryNACS · 11.5 kW avg

Estimated cost

$10.23

83.9 kWh billed

Charging time

7h 18m

+195 miles added

Cost per 100 miles

$5.25

Annual savings vs. gas

+$558/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.65 / 100 mi
Tesla Cybertruck AWD$5.25
28 MPG gas car ($2.77/gal)$9.89
Real-world physics: Includes a 12% AC charging loss factor (73.8 kWh ÷ 0.88 = 83.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$17.05

139.8 kWh billed · 12h 9m (L2)

Daily charge (20–80%)

$10.23

+195 mi range · 7h 18m (L2)

Home vs. public DC (20–80%)

$10.23 vs. $28.78

DC fast takes 33m (~$0.39/kWh)

12,000-mile annual savings

+$558/yr

EV $630 vs. gas $1,187

Hardware specification

Home charger hardware requirements for Tesla Cybertruck AWD

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

NACS (SAE J3400)

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Tesla Cybertruck AWD in Oklahoma

How much does it cost to fully charge a Tesla Cybertruck AWD in Oklahoma?

At Oklahoma's average residential electricity rate of $0.122/kWh, a full 0% to 100% home charge for the Tesla Cybertruck AWD (123 kWh usable battery) costs $17.05. This includes a realistic 12% AC charging loss, meaning your meter bills 139.8 kWh.

How much does a 20% to 80% daily charge cost in Oklahoma?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.23 and adds 195 miles of EPA range in 7h 18m. At a public DC fast charger (~$0.39/kWh), the same 20%–80% session costs $28.78 and takes about 33m.

How long does it take to charge a Tesla Cybertruck AWD at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 7h 18m, while a standard 120V Level 1 outlet takes 59h 54m. On a high-speed DC fast charger, 10%–80% takes roughly 39m.

How much money does a Tesla Cybertruck AWD save vs. a gas car in Oklahoma?

Driving 12,000 miles per year in Oklahoma costs $630/year in home electricity ($5.25 per 100 miles), compared to $1,187/year for a 28 MPG gas car at $2.77/gal — saving you $558 annually.

Compare Tesla Cybertruck AWD in other states