EVChargeCalc

Tennessee (TN) · $0.128/kWh · NACS · 123 kWh

Cost to charge a Tesla Cybertruck Cyberbeast in Tennessee

Charging a 2025 Tesla Cybertruck Cyberbeast at home in Tennessee costs $17.89 for a full 0–100% charge or $10.73 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.128/kWh

Charger type
20%
80%
Charging summaryNACS · 11.5 kW avg

Estimated cost

$10.73

83.9 kWh billed

Charging time

7h 18m

+181 miles added

Cost per 100 miles

$5.94

Annual savings vs. gas

+$495/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.13 / 100 mi
Tesla Cybertruck Cyberbeast$5.94
28 MPG gas car ($2.82/gal)$10.07
Real-world physics: Includes a 12% AC charging loss factor (73.8 kWh ÷ 0.88 = 83.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$17.89

139.8 kWh billed · 12h 9m (L2)

Daily charge (20–80%)

$10.73

+181 mi range · 7h 18m (L2)

Home vs. public DC (20–80%)

$10.73 vs. $30.26

DC fast takes 33m (~$0.41/kWh)

12,000-mile annual savings

+$495/yr

EV $713 vs. gas $1,209

Hardware specification

Home charger hardware requirements for Tesla Cybertruck Cyberbeast

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

NACS (SAE J3400)

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.5 kW

Frequently asked questions: Tesla Cybertruck Cyberbeast in Tennessee

How much does it cost to fully charge a Tesla Cybertruck Cyberbeast in Tennessee?

At Tennessee's average residential electricity rate of $0.128/kWh, a full 0% to 100% home charge for the Tesla Cybertruck Cyberbeast (123 kWh usable battery) costs $17.89. This includes a realistic 12% AC charging loss, meaning your meter bills 139.8 kWh.

How much does a 20% to 80% daily charge cost in Tennessee?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.73 and adds 181 miles of EPA range in 7h 18m. At a public DC fast charger (~$0.41/kWh), the same 20%–80% session costs $30.26 and takes about 33m.

How long does it take to charge a Tesla Cybertruck Cyberbeast at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11.5 kW onboard charger), a 20%–80% charge takes 7h 18m, while a standard 120V Level 1 outlet takes 59h 54m. On a high-speed DC fast charger, 10%–80% takes roughly 39m.

How much money does a Tesla Cybertruck Cyberbeast save vs. a gas car in Tennessee?

Driving 12,000 miles per year in Tennessee costs $713/year in home electricity ($5.94 per 100 miles), compared to $1,209/year for a 28 MPG gas car at $2.82/gal — saving you $495 annually.

Compare Tesla Cybertruck Cyberbeast in other states