EVChargeCalc

Tennessee (TN) · $0.128/kWh · CCS · 107 kWh

Cost to charge a Volvo EX90 Twin Motor in Tennessee

Charging a 2025 Volvo EX90 Twin Motor at home in Tennessee costs $15.56 for a full 0–100% charge or $9.34 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.128/kWh

Charger type
20%
80%
Charging summaryCCS · 11.0 kW avg

Estimated cost

$9.34

73.0 kWh billed

Charging time

6h 38m

+186 miles added

Cost per 100 miles

$5.02

Annual savings vs. gas

+$606/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $5.05 / 100 mi
Volvo EX90 Twin Motor$5.02
28 MPG gas car ($2.82/gal)$10.07
Real-world physics: Includes a 12% AC charging loss factor (64.2 kWh ÷ 0.88 = 73.0 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$15.56

121.6 kWh billed · 11h 3m (L2)

Daily charge (20–80%)

$9.34

+186 mi range · 6h 38m (L2)

Home vs. public DC (20–80%)

$9.34 vs. $26.32

DC fast takes 26m (~$0.41/kWh)

12,000-mile annual savings

+$606/yr

EV $602 vs. gas $1,209

Hardware specification

Home charger hardware requirements for Volvo EX90 Twin Motor

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.0 kW

Frequently asked questions: Volvo EX90 Twin Motor in Tennessee

How much does it cost to fully charge a Volvo EX90 Twin Motor in Tennessee?

At Tennessee's average residential electricity rate of $0.128/kWh, a full 0% to 100% home charge for the Volvo EX90 Twin Motor (107 kWh usable battery) costs $15.56. This includes a realistic 12% AC charging loss, meaning your meter bills 121.6 kWh.

How much does a 20% to 80% daily charge cost in Tennessee?

Topping up from 20% to 80% at home on a Level 2 charger costs $9.34 and adds 186 miles of EPA range in 6h 38m. At a public DC fast charger (~$0.41/kWh), the same 20%–80% session costs $26.32 and takes about 26m.

How long does it take to charge a Volvo EX90 Twin Motor at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11 kW onboard charger), a 20%–80% charge takes 6h 38m, while a standard 120V Level 1 outlet takes 52h 7m. On a high-speed DC fast charger, 10%–80% takes roughly 30m.

How much money does a Volvo EX90 Twin Motor save vs. a gas car in Tennessee?

Driving 12,000 miles per year in Tennessee costs $602/year in home electricity ($5.02 per 100 miles), compared to $1,209/year for a 28 MPG gas car at $2.82/gal — saving you $606 annually.

Compare Volvo EX90 Twin Motor in other states