EVChargeCalc

District of Columbia (DC) · $0.174/kWh · CCS · 86 kWh

Cost to charge a Volkswagen ID. Buzz Pro S in District of Columbia

Charging a 2025 Volkswagen ID. Buzz Pro S at home in District of Columbia costs $17.00 for a full 0–100% charge or $10.20 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.174/kWh

Charger type
20%
80%
Charging summaryCCS · 11.0 kW avg

Estimated cost

$10.20

58.6 kWh billed

Charging time

5h 20m

+140 miles added

Cost per 100 miles

$7.27

Annual savings vs. gas

+$564/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $4.70 / 100 mi
Volkswagen ID. Buzz Pro S$7.27
28 MPG gas car ($3.35/gal)$11.96
Real-world physics: Includes a 12% AC charging loss factor (51.6 kWh ÷ 0.88 = 58.6 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$17.00

97.7 kWh billed · 8h 53m (L2)

Daily charge (20–80%)

$10.20

+140 mi range · 5h 20m (L2)

Home vs. public DC (20–80%)

$10.20 vs. $23.74

DC fast takes 22m (~$0.46/kWh)

12,000-mile annual savings

+$564/yr

EV $872 vs. gas $1,436

Hardware specification

Home charger hardware requirements for Volkswagen ID. Buzz Pro S

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.0 kW

Frequently asked questions: Volkswagen ID. Buzz Pro S in District of Columbia

How much does it cost to fully charge a Volkswagen ID. Buzz Pro S in District of Columbia?

At District of Columbia's average residential electricity rate of $0.174/kWh, a full 0% to 100% home charge for the Volkswagen ID. Buzz Pro S (86 kWh usable battery) costs $17.00. This includes a realistic 12% AC charging loss, meaning your meter bills 97.7 kWh.

How much does a 20% to 80% daily charge cost in District of Columbia?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.20 and adds 140 miles of EPA range in 5h 20m. At a public DC fast charger (~$0.46/kWh), the same 20%–80% session costs $23.74 and takes about 22m.

How long does it take to charge a Volkswagen ID. Buzz Pro S at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11 kW onboard charger), a 20%–80% charge takes 5h 20m, while a standard 120V Level 1 outlet takes 41h 53m. On a high-speed DC fast charger, 10%–80% takes roughly 26m.

How much money does a Volkswagen ID. Buzz Pro S save vs. a gas car in District of Columbia?

Driving 12,000 miles per year in District of Columbia costs $872/year in home electricity ($7.27 per 100 miles), compared to $1,436/year for a 28 MPG gas car at $3.35/gal — saving you $564 annually.

Compare Volkswagen ID. Buzz Pro S in other states