Cost to charge a Nissan LEAF SV Plus in Georgia

Charging a 2025 Nissan LEAF SV Plus at home in Georgia costs $9.61 for a full 0–100% charge or $5.77 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.141/kWh

Charger type
20%
80%
Charging summaryCCS · 6.6 kW avg

Estimated cost

$5.77

40.9 kWh billed

Charging time

6h 12m

+127 miles added

Cost per 100 miles

$4.53

Annual savings vs. gas

+$720/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $6.00 / 100 mi
Nissan LEAF SV Plus$4.53
28 MPG gas car ($2.95/gal)$10.54
Real-world physics: Includes a 12% AC charging loss factor (36.0 kWh ÷ 0.88 = 40.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$9.61

68.2 kWh billed · 10h 20m (L2)

Daily charge (20–80%)

$5.77

+127 mi range · 6h 12m (L2)

Home vs. public DC (20–80%)

$5.77 vs. $15.12

DC fast takes 39m (~$0.42/kWh)

12,000-mile annual savings

+$720/yr

EV $544 vs. gas $1,264

Hardware specification

Home charger hardware requirements for Nissan LEAF SV Plus

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

6.6 kW

Frequently asked questions: Nissan LEAF SV Plus in Georgia

How much does it cost to fully charge a Nissan LEAF SV Plus in Georgia?

At Georgia's average residential electricity rate of $0.141/kWh, a full 0% to 100% home charge for the Nissan LEAF SV Plus (60 kWh usable battery) costs $9.61. This includes a realistic 12% AC charging loss, meaning your meter bills 68.2 kWh.

How much does a 20% to 80% daily charge cost in Georgia?

Topping up from 20% to 80% at home on a Level 2 charger costs $5.77 and adds 127 miles of EPA range in 6h 12m. At a public DC fast charger (~$0.42/kWh), the same 20%–80% session costs $15.12 and takes about 39m.

How long does it take to charge a Nissan LEAF SV Plus at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 6.6 kW onboard charger), a 20%–80% charge takes 6h 12m, while a standard 120V Level 1 outlet takes 29h 13m. On a high-speed DC fast charger, 10%–80% takes roughly 45m.

How much money does a Nissan LEAF SV Plus save vs. a gas car in Georgia?

Driving 12,000 miles per year in Georgia costs $544/year in home electricity ($4.53 per 100 miles), compared to $1,264/year for a 28 MPG gas car at $2.95/gal — saving you $720 annually.