EVChargeCalc

2025 Sedan · CCS connector · 79 kWh usable battery

Polestar 2 Long Range Single Motor Charging Cost & Time Calculator

320 mi EPA range · 11 kW max AC onboard charger · 205 kW peak DC fast charge (28 min 10%–80%).

$

EIA state average: $0.312/kWh

Charger type
20%
80%
Charging summaryCCS · 11.0 kW avg

Estimated cost

$16.81

53.9 kWh billed

Charging time

4h 54m

+192 miles added

Cost per 100 miles

$8.75

Annual savings vs. gas

+$955/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $7.96 / 100 mi
Polestar 2 Long Range Single Motor$8.75
28 MPG gas car ($4.68/gal)$16.71
Real-world physics: Includes a 12% AC charging loss factor (47.4 kWh ÷ 0.88 = 53.9 kWh from wall) so estimates reflect your utility bill.

Polestar 2 Long Range Single Motor charging time & cost by charger type

Calculated using US average rates ($0.168/kWh home AC with 12% charging loss; $0.450/kWh public DC fast).

Charger typePower20%–80% time20%–80% cost0%–100% time0%–100% cost
Level 1 (1.4 kW)1.4 kW38h 28m$9.0564h 7m$15.08
Level 2 (7.2 kW)7.2 kW7h 29m$9.0512h 28m$15.08
Level 2 (9.6 kW)9.6 kW5h 37m$9.059h 21m$15.08
Level 2 (11.5 kW)11.0 kW4h 54m$9.058h 10m$15.08
DC Fast Charger118.5 kW24m$21.3353m$35.55
Hardware specification

Home charger hardware requirements for Polestar 2 Long Range Single Motor

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.0 kW

Polestar 2 Long Range Single Motor charging cost by state

Select your state for local utility costs, DC fast-charging comparisons, and annual gas savings on EV Charge Calc.