EVChargeCalc

New Jersey (NJ) · $0.186/kWh · CCS · 79 kWh

Cost to charge a Polestar 2 Long Range Single Motor in New Jersey

Charging a 2025 Polestar 2 Long Range Single Motor at home in New Jersey costs $16.70 for a full 0–100% charge or $10.02 for a 20%–80% daily top-up (12% AC charging loss factored).

$

EIA state average: $0.186/kWh

Charger type
20%
80%
Charging summaryCCS · 11.0 kW avg

Estimated cost

$10.02

53.9 kWh billed

Charging time

4h 54m

+192 miles added

Cost per 100 miles

$5.22

Annual savings vs. gas

+$707/yr

12,000 mi/yr vs. 28 MPG

100-mile fuel cost comparisonSave $5.89 / 100 mi
Polestar 2 Long Range Single Motor$5.22
28 MPG gas car ($3.11/gal)$11.11
Real-world physics: Includes a 12% AC charging loss factor (47.4 kWh ÷ 0.88 = 53.9 kWh from wall) so estimates reflect your utility bill.

Full charge (0–100%)

$16.70

89.8 kWh billed · 8h 10m (L2)

Daily charge (20–80%)

$10.02

+192 mi range · 4h 54m (L2)

Home vs. public DC (20–80%)

$10.02 vs. $22.28

DC fast takes 24m (~$0.47/kWh)

12,000-mile annual savings

+$707/yr

EV $626 vs. gas $1,333

Hardware specification

Home charger hardware requirements for Polestar 2 Long Range Single Motor

Recommended residential Level 2 EVSE specifications to achieve full overnight charging speed.

Required connector

CCS1 / SAE J1772

Recommended breaker

40A–60A (240V)

Max AC acceptance rate

11.0 kW

Frequently asked questions: Polestar 2 Long Range Single Motor in New Jersey

How much does it cost to fully charge a Polestar 2 Long Range Single Motor in New Jersey?

At New Jersey's average residential electricity rate of $0.186/kWh, a full 0% to 100% home charge for the Polestar 2 Long Range Single Motor (79 kWh usable battery) costs $16.70. This includes a realistic 12% AC charging loss, meaning your meter bills 89.8 kWh.

How much does a 20% to 80% daily charge cost in New Jersey?

Topping up from 20% to 80% at home on a Level 2 charger costs $10.02 and adds 192 miles of EPA range in 4h 54m. At a public DC fast charger (~$0.47/kWh), the same 20%–80% session costs $22.28 and takes about 24m.

How long does it take to charge a Polestar 2 Long Range Single Motor at home vs. DC fast charging?

On a 48A Level 2 home charger (limited by the vehicle's 11 kW onboard charger), a 20%–80% charge takes 4h 54m, while a standard 120V Level 1 outlet takes 38h 28m. On a high-speed DC fast charger, 10%–80% takes roughly 28m.

How much money does a Polestar 2 Long Range Single Motor save vs. a gas car in New Jersey?

Driving 12,000 miles per year in New Jersey costs $626/year in home electricity ($5.22 per 100 miles), compared to $1,333/year for a 28 MPG gas car at $3.11/gal — saving you $707 annually.

Compare Polestar 2 Long Range Single Motor in other states